Case Studies
We don’t just fill roles — we build teams that get the job done. Our case studies showcase how Romax Solutions has helped leading construction companies solve workforce challenges, scale operations, and deliver complex projects successfully. See how our expertise in construction recruitment makes a measurable difference.
This 300,000sq ft Bloomsbury Square Grade 2 listed building involved a complex demolition and refurbishment to convert it into a Grade A wet lab-enabled life sciences space.
VICTORIA HOUSE
BATTERSEA POWER STATION
When redeveloping one of the world’s most iconic Power Stations, we were heavily involved with the supply of specialist’s trades and labour throughout Phase 2 (2018) and Phase 3 (2022).
FUTURE OLYMPIA (KENSINGTON)
This highly complex demolition and intervention works involved assisting one of the leading contractors in the UK.
To complete an asbestos removal and demolition of a National Grid site in Ashford for a leading UK contractor, this project required a detailed recruitment plan to help put together a specialised team of 12 Skilled Demolition and IPAF operatives.
NATIONAL GRID
We were chosen as the sole labour supplier to McLaren Construction Group for their ‘ExCeL Centre, Chapters’ project.
EXCEL CENTRE
MINISTRY OF DEFENCE
We’re proud to have consistently provided a wide range of skilled trades to a high-profile Ministry of Defence (MoD) site. Our workforce has included CSCS Labourers, CPCS Traffic Marshals, Dumper Drivers,
CANVEY ISLAND SEA DEFENCE PROJECT
In 2023, we began work on a significant infrastructure project at Canvey Island, aimed at reinforcing the sea wall and constructing a new defence barrier. This was a heavy civils project that demanded a highly skilled and safety-conscious workforce.
LONDON GATEWAY PORT
The Solent Container Yard Extension at London Gateway Port was a significant civil engineering project aimed at expanding one of the UK’s most strategically important logistics hubs. This extension was critical to enhancing the port’s container handling capacity and improving overall operational efficiency.
Helping facilitate the construction of new student accommodation at Willen House involved a critical series of preparatory activities, including cut and carve, soft stripping, temporary works installation, and groundworks.
WILLEM HOUSE
63 New Bond Street
This project involved addressing a series of complex challenges which we assisted with; Lifting Teams, Plant Operators, Demolition Labourers and a full Logistics and Traffic Management Team were put into place to cover the work which included Structural Demolition including soft strip, Cut & carve demolition,
Dover Western
Dock Regeneration
In assisting in this project there was a real challenge in finding suitable Burner candidates required to carry out a demolition of the old swing bridge, as location was a huge issue.
 
        
        
      
    
    Contact us
Interested in working together? Fill out some info and we will be in touch shortly. We can’t wait to hear from you!
 
                         
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
              